Scope: TETS-AC/DC tracking and erosion test system can integrate AC and DC high voltage, control, measurement, calculation and management. It can output 10kV HVAC, 15kV HVDC, and the pollution flow can be controlled from 0.075 ml/min to 0.9 ml/min. The system can be used to test the resistance to electric leakage and electric erosion of insulating materials and power equipment. The meet the requirements of IEC 60587 and relevant standards. it meets the requirements of IEC 60099-4 and relevant standards.
Tracking and erosion test system for electrical insulation materials
Main specifications are as follows
High voltage | Amplitude | Contaminated liquid |
AC | 10kV | 0.075ml/min~0.9 ml/min Control accuracy:±1.5% |
DC | 15kV | 0.2 ml/min or other Control accuracy:±1.5% |
ADDRESS: No.1,Huoju Road, Beilin District, Xi'an,Shaanxi, China
TEL:86-(0)-82681326 86-(0)-83204290
E-mail: jddyjs@163.com